ReviewEnergy
Review Date06/27/2016
StatusApproved
Comments
The scope of work for lighting that will be removed, existing light to remain and new lighting is not clear. For example, sheet A11.1 shows existing lights to remain. Sheet E10.0 does not show any existing lighting. In addition sheet A30.0 indicates that the meeting rooms will "Remove Light Fixture, prepare for new fixture" but there is no electrical plan that shows the new lighting design. In the resubmission, clearly show the existing lighting to be removed, existing lighting to remain and new lighting to be installed. Typically a project can clearly communicate this using one demolition drawing for a space showing the fixtures to be removed and the fixtures to remain, and a second drawing showing the remaining fixtures and the new fixtures. Note: existing fixtures to remain must be included in the lighting schedule and in the Interior Lighting COMcheck.
  



  
 
Search Permits By:   Address
Permit Number
Date